In this section provided a list of the most significant and sophisticated projects since the company’s foundation.

2025 - Eesti Energia. Испытательный стенд каталитической конверсии продуктов сланцепереработки.

EESTI ENERGIA

Pilot-scale test facility for catalytic conversion of oil shale processing products.

2025. Электроподогреватель сланцевого масла

BALTI Elektrijaam

Supply, installation, and commissioning of an electric heater for shale oil for the Baltic Power Plant.

2024 - ENEFIT POWER - Авторский надзор

ENEFIT POWER

Supervision of installation works according to the working project "Design of process pipelines and overpasses for Enefit 280-2"

2024 - Kivioli Kemiatoostuse OÜ - Boiler 4

Kivioli Kemiatoostuse OÜ

Two front wall burners 8 MWth capacity each using low calorific oil shale processing gas as a fuel for steam boiler4

2023 - IRU ELEKTRIJAAM

IRU Elektrijaam

Reconstruction of the boiler with the installation of 3 Low-NOX dual-fuel burners of the ENTEH design with a capacity of 23 MW each, running on Natural Gas and Light Fuel Oil #2, at the ENEFIT GREEN power plant.

2023 - PAIDE Elektrijaam, Dual fuel Start-Up Burner

Paide elektrijaam

2023 - VKG Oil - Исследование взрывоопасности

VKG Oil

Study of the explosiveness of venting mixtures at VKG OIL AS

2022 - ENEFIT POWER

ENEFIT 280-2

Development of design documentation for the construction of overpasses and pipelines for the new shale pyrolysis plant ENEFIT-280-2.

2022 - KKT OIL - Generaatorgaasi torustiku rekonstrueerimine

KKT EJ

Reconstruction of the generator gas pipeline

[12 3 4 5  >>  

Supply of equipment

Boilers and burners,
Igniters,
Pumps,
Heat exchangers,
Fittings,
Valves Instrumentation equipment

Contacts

ENTEH Engineering AS
Reg.nr: 10339194
Elektriku 3, 30328
Kohtla-Järve Estonia
GSM +372 506 6323
Office +372 337 3357
e-mail: info@enteh.ee

This website uses cookies to ensure you get the best experience on our website