In this section provided a list of the most significant and sophisticated projects since the company’s foundation.

2013 EESTI ENERGIA

Computational, analytical research and development of technology for combined firing of high-calorific (retort) gas of oil shale processing and pulverized oil shale in TP-101 boiler at Estonian powerplant (jointl with JSC „VTI“ and MPEI). Customer - EESTI ENERGIA.

REPO by SORBES

Design and construction of CHP with OPRA gas turbine. Electrical capacity 1800 kW. Heat utilization system’s capacity up to 4500 kW. ENTEH was responsible for all design works (basic and detailed). EPC contractor for gas turbine’s exhaust gas heat utilization part.

2012 - SILLAMÄE Power Plant

Design development and istallation of start-up burner, configured by ENTEH, for bubbling fluidized-bed boiler on wood sawdust. Burner capacity 10 MW, fuel – shale oil. Customer - SILLAMÄE Power Plant.

2012- KIVIÕLI KEEMIATÖÖSTUSE OÜ

Boiler’s E-25 and TS-35 reconstruction design development to increase quantity of oil shale processing gases fired in the boilers (jointly with JSC „VTI“). Design development and installation of 5 MW low-calorific (generator) oil shale processing gas burners configured by ENTEH. Customer – Kivioli Oil Shale Processing Plant.

EESTI ENERGOMONTAAZ and FORTUM POWER AND HEAT

Detailed design documentation development for hot air ducts and heat transfer surfaces in TP-101 boiler’s furnacereconstruction for two-stagepulverized oil shale firing technology implementationin order to reduce NOX (technology and basic design was proposed by FORTUM). Customer - EESTI ENERGOMONTAAZ and FORTUM POWER AND HEAT.

2011 VKG Energia OÜ

Design and manufacturing of 13 MW burners for high-calorific (retort) gas of oil shale processing. Reconstruction of the oil shale boiler BKZ-75-39F for combined firing of oil shale, retort (high-calorific) gas and generator (low-calorific) gas. Two retort gas burners were additionally installed on BKZ-75-39F boiler. Customer - VKG Energia OÜ.

2011 EESTI ELEKTRIJAAM

Design documentation development of limestone pulverization and injection system into the TP-101 boiler’s furnace in order to reduce sulphur dioxide emmissions. Customer - EESTI POWER PLANT.

2010 VKG Energia OÜ

EPC constract for constructionof dry ash handling system for BKZ-75-39FSl boiler. Plant’s solids intake – up to 7 t/h, length of the pneumatic conveyor system – 250 meters, pneumatic chamber pump MACTENN. Consequently, the similar system was installed on another BKZ-75-39FSl boiler. Customer - VKG Energia OÜ.

2010 HORIZON PULP and PAPER

Design documentation development for 100 m3 oil fuels store. Customer - HORIZON PULP and PAPER.

<<  1 2 3 [45 6 7  >>  

Supply of equipment

Boilers and burners,
Igniters,
Pumps,
Heat exchangers,
Fittings,
Valves Instrumentation equipment

Contacts

ENTEH Engineering AS
Reg.nr: 10339194
Elektriku 3, 30328
Kohtla-Järve Estonia
GSM +372 506 6323
Office +372 337 3357
e-mail: info@enteh.ee

This website uses cookies to ensure you get the best experience on our website