2024 - ENEFIT POWER

2024 - ENEFIT POWER - Авторский надзор

Supervision of installation works according to the working project "Design of process pipelines and overpasses for Enefit 280-2"

2024 - Kivioli Kemiatoostuse OÜ

2024 - Kivioli Kemiatoostuse OÜ - Boiler 4

Two front wall burners 8 MWth capacity each using low calorific oil shale processing gas as a fuel for steam boiler4

2023 - IRU Elektrijaam

2023 - IRU ELEKTRIJAAM

Reconstruction of the boiler with the installation of 3 Low-NOX dual-fuel burners of the ENTEH design with a capacity of 23 MW each, running on Natural Gas and Light Fuel Oil #2, at the ENEFIT GREEN power plant.

2023 - Paide elektrijaam

2023 - PAIDE Elektrijaam, Dual fuel Start-Up Burner

2023 - VKG Oil

2023 - VKG Oil - Исследование взрывоопасности

Study of the explosiveness of venting mixtures at VKG OIL AS

2022 - ENEFIT 280-2

2022 - ENEFIT POWER

Development of design documentation for the construction of overpasses and pipelines for the new shale pyrolysis plant ENEFIT-280-2.

2022 - KKT EJ

2022 - KKT OIL - Generaatorgaasi torustiku rekonstrueerimine

Reconstruction of the generator gas pipeline

2022 - KKT OIL

2022 - KKT OIL

2022 - KKT Elektrijaam

2022 - KKT OIL
[12 3 4 5  >>  

Supply of equipment

Boilers and burners,
Igniters,
Pumps,
Heat exchangers,
Fittings,
Valves Instrumentation equipment

Contacts

ENTEH Engineering AS
Reg.nr: 10339194
Elektriku 3, 30328
Kohtla-Järve Estonia
GSM +372 506 6323
Office +372 337 3357
e-mail: info@enteh.ee

This website uses cookies to ensure you get the best experience on our website