In this section provided a list of the most significant and sophisticated projects since the company’s foundation.

2009 EESTI ENERGIA

Project documentation development for technology of shale oil heavy fractions purification (hard particles removal) based on preliminary dilution with gasoline fractions and subsequent centrifugation. Customer – shale oil production plant, EESTI ENERGIA.

2008 AHTME ELEKTRIJAAM

EPC constract for installation of one steam and one hot water boilers of 10 MW at Ahtme Powerplant, each operating on shale oil. Boilers supplied by LOOS and burners by SAACKE. Customer – Ahtme Powerplant.

2008 SILBET AS

Project documentation development and assembly works of process piplenes (steam and drains) for three autoclaves, that produce construction bricks Steam pressure 12 bar, each autoclave’s volume - 160 m3, G module in compliance with PED 97/23. Customer – Silbet AS.

2007 - VKG OIL AS

Design projects of retort gas, natural gas, steam, feedand heating water process pipelines from Petroter I to Northern and Southern powerplants of VKG Energia. Consequently the same projects were designed for  Petroter 2 and Petroter 3 plants.

2007 IRU ELEKTRIJAAM

Reconstrcution of the natural gas supply system to the burners of three 100MW steam boilers. Development and implementation of their algorithm for automated start-up and operation. Customer -  IRU POWERPLANT.

2007 - VKG Energia OÜ

Test bench installation for pulverized limestone injection into the BKZ-75-39F boiler’s furnace at the VKG Energia powerplant to research sulphur dioxide capturing processes while firing high sulphurous gas of oil shale processing. Own financing.

2007 EESTI ELEKTRIJAAM

Installation of flattening screen in K-200-130 turbine’s HP Cylinder for efficiency increase at low load (MPEI patent). Following, the same technology was istalled on two turbines. Customer – ESTONIAN POWERPLANT.

2006 REPO VABRIKUD

Development of the burneres for combined cofiring of natural gas and wood dust, their consequent installation at four plant’s drying units. Burner’s thermal capacity is 6 MW. Customer – REPO VABRIKUD.

2006 BALTI ELEKTRIJAAM

Project documentation development for turbine hall’s heating and ventilation systems’reconstruction.  Customer - BALTI POWER PLANT.

<<  1 2 3 4 [56 7  >>  

Supply of equipment

Boilers and burners,
Igniters,
Pumps,
Heat exchangers,
Fittings,
Valves Instrumentation equipment

Contacts

ENTEH Engineering AS
Reg.nr: 10339194
Elektriku 3, 30328
Kohtla-Järve Estonia
GSM +372 506 6323
Office +372 337 3357
e-mail: info@enteh.ee

This website uses cookies to ensure you get the best experience on our website