In this section provided a list of the most significant and sophisticated projects since the company’s foundation.
VKG Energia OÜ.
Elektriku 3, 30328, Kohtla-Järve, 30328 Ida-Viru maakond
EPC constract for constructionof dry ash handling system for BKZ-75-39FSl boiler. Plant’s solids intake – up to 7 t/h, length of the pneumatic conveyor system – 250 meters, pneumatic chamber pump MACTENN. Consequently, the similar system was installed on another BKZ-75-39FSl boiler. Customer - VKG Energia OÜ.
Supply of equipment
Boilers and burners,
Igniters,
Pumps,
Heat exchangers,
Fittings,
Valves Instrumentation equipment
Contacts
ENTEH Engineering AS
Reg.nr: 10339194
Elektriku 3, 30328
Kohtla-Järve Estonia
GSM +372 506 6323
Office +372 337 3357
e-mail: info@enteh.ee





