Detailed design documentation development for hot air ducts and heat transfer surfaces in TP-101 boiler’s furnacereconstruction for two-stagepulverized oil shale firing technology implementationin order to reduce NOX (technology and basic design was proposed by FORTUM). Customer - EESTI ENERGOMONTAAZ and FORTUM POWER AND HEAT.