2021 - Auvere Elektrijaam
Design, construction and deployment of retort gas, pyrolysis water and urea pipelines at Auvere Power Plant.
Designed for burning 100% oil shale, up to 50% wood chips and oil shale, up to 10% retort gas and up to 20% peat. The aim of the project is to increase the share of combustible retort gas (up to 50%) in the Enefit Power Auvere CFB boiler. To this end, pipelines have been designed for the transport of retort gas, pyrolysis water and urea to the boiler house.